Projects   Resume   

Six Days in Fallujah
Role: Lead Technical Designer

This is a SketchUp video demonstrating the level design pipeline to the game engine. The turnaround time to export is less than 30 seconds. The next video shows what this level looks like in the engine.

Return to Home